Businesses in Austria face rising electricity costs, growing e-mobility, limited grid connections and large PV systems.

Businesses in Austria face rising electricity costs, growing e-mobility, limited grid connections and large PV systems.

Why does this topic matter?

  • increase PV self-consumption
  • reduce load peaks
  • enable EV charging stations
  • prepare backup power
  • make better use of the grid connection

Matching products and solutions

The OmniCube A215 as the featured product; Elecnova for smaller and larger C&I projects; PotisBank for MWh applications.

What data do we need?

  • 15-minute load profile
  • electricity bill and grid bill
  • PV capacity and PV generation
  • grid connection capacity
  • information on e-mobility
  • critical loads for backup power
  • installation site and photos

CTA

Next step: Send us your load profile, electricity bill, PV data and project goal. Speichercampus assesses which storage capacity, power and product class make sense.

Button: Get your storage project reviewed

Matching products

  • LONGi OmniCube A215 LONGi LONGi OmniCube A215

    Integrated DC flexibility system for commerce and industry: 215 kWh, 105 kW, optional STS for grid/island operation and direct PV connection via MPPT.

    215 kWh · 105 kW

  • Elecnova ECO-E101WX Elecnova Elecnova ECO-E101WX

    All-in-one air-cooled storage cabinet: 101 kWh, 100 kW with 1P fast charging — expandable in parallel on the AC side.

    101 kWh · 100 kW

  • LONGi PotisBank L5.0 LONGi LONGi PotisBank L5.0

    Liquid-cooled utility-scale ESS in a 20 ft container: 5.0 MWh DC block with the ICCS safety system for grid-scale storage projects.

    5 MWh