Commercial storage in Austria
Businesses in Austria face rising electricity costs, growing e-mobility, limited grid connections and large PV systems.
Businesses in Austria face rising electricity costs, growing e-mobility, limited grid connections and large PV systems.
Why does this topic matter?
- increase PV self-consumption
- reduce load peaks
- enable EV charging stations
- prepare backup power
- make better use of the grid connection
Matching products and solutions
The OmniCube A215 as the featured product; Elecnova for smaller and larger C&I projects; PotisBank for MWh applications.
What data do we need?
- 15-minute load profile
- electricity bill and grid bill
- PV capacity and PV generation
- grid connection capacity
- information on e-mobility
- critical loads for backup power
- installation site and photos
CTA
Next step: Send us your load profile, electricity bill, PV data and project goal. Speichercampus assesses which storage capacity, power and product class make sense.
Button: Get your storage project reviewed
Matching products
-
LONGi LONGi OmniCube A215 Integrated DC flexibility system for commerce and industry: 215 kWh, 105 kW, optional STS for grid/island operation and direct PV connection via MPPT.
215 kWh · 105 kW
-
Elecnova Elecnova ECO-E101WX All-in-one air-cooled storage cabinet: 101 kWh, 100 kW with 1P fast charging — expandable in parallel on the AC side.
101 kWh · 100 kW
-
LONGi LONGi PotisBank L5.0 Liquid-cooled utility-scale ESS in a 20 ft container: 5.0 MWh DC block with the ICCS safety system for grid-scale storage projects.
5 MWh